A SBIR Phase I contract was awarded to Mainstream Engineering Corporation in June, 2023 for $179,991.0 USD from the U.S. Department of Defense and United States Air Force.
The supercritical nature and uncertainty in composition of high temperature and pressure, cracking fuel on hypersonic vehicles makes it difficult to accurately measure mass flow rate using conventional flow meters. To address this, Mainstream Engineering