A SBIR Phase II contract was awarded to RAINMAKER SOLUTIONS, INC. in March, 2021 for $832,399.0 USD from the U.S. Department of Defense and United States Air Force.
Dehydration is one of the most critical health and safety issues facing the Operator today. The operational environment is unpredictable and full of potential obstacles to be properly hydrated. Many over-drink upfront to save weight or drink too little an