Log in
Enquire now
‌

US Patent 10083094 Objective based backup job scheduling

Patent 10083094 was granted and assigned to Cohesity on September, 2018 by the United States Patent and Trademark Office.

OverviewStructured DataIssuesContributors

Contents

Is a
Patent
Patent

Patent attributes

Patent Applicant
Cohesity
Cohesity
Current Assignee
Cohesity
Cohesity
Patent Jurisdiction
United States Patent and Trademark Office
United States Patent and Trademark Office
Patent Number
10083094
Date of Patent
September 25, 2018
Patent Application Number
14863250
Date Filed
September 23, 2015
Patent Citations Received
‌
US Patent 11860942 Predictive loading and unloading of customer data in memory
0
‌
US Patent 11249862 Method for managing backup system, electronic device and computer program product
‌
US Patent 11669415 Packet-based differential backup of network-attached storage device content
0
‌
US Patent 11409558 Method, device and computer program product for job management
‌
US Patent 10409520 Replication of content-based storage using address space slices
‌
US Patent 10503609 Replication link smoothing using historical data
‌
US Patent 11237923 Packet-based differential backup of network-attached storage device content
‌
US Patent 10732886 Application distributed optimal backup model
...
Patent Primary Examiner
‌
Nadeem Iqbal
Patent abstract

A method and apparatus for scheduling backup tasks on a source system specified by a backup job to meet a recovery point objective (RPO) specified for the backup job is presented. A method generally includes estimating resource utilization at the source system expected during a plurality of time periods based on historical resource utilization by jobs executed on the source system. The backup system estimates a time required to complete the backup tasks during each time period on the source system based on the estimated resource utilization for each time period and historical backup performance data. Upon determining that the estimated time required to complete the backup tasks for one or more of the time periods meets the RPO, the backup system schedules the backup tasks to be executed during a time period of the one or more time periods with the lowest estimated resource utilization.

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like US Patent 10083094 Objective based backup job scheduling

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us