Patent attributes
A controller for central plant equipment obtains a model of one or more sources configured to supply input resources, one or more subplants configured to convert the input resources to output resources, and one or more sinks configured to consume the output resources. The controller generates a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource. The first amount of each resource includes a sum of an amount of the resource supplied by the sources and an amount of the resource produced by the subplants. The second amount of each resource includes a sum of an amount of the resource consumed by the subplants and an amount of the resource consumed by the sinks. The controller performs an optimization of an objective function subject to the resource balance constraint to determine target amounts of each resource to be produced or consumed by the central plant equipment at a plurality of times within an optimization period. The controller controls the central plant equipment to produce or consume the target amounts of each resource at the plurality of times within the optimization period.