Patent attributes
An exemplary method includes forming a sacrificial layer along sidewalls of an array of trenches that are indented into a substrate, depositing a fill layer over the sacrificial layer, and then creating an array of gaps between the fill layer and the substrate by removing the sacrificial layer along the sidewalls of the trenches, while maintaining a structural connection between the substrate and the fill layer at the floors of the trenches. The method further includes covering the substrate, the fill layer, and the gaps with a cap layer that seal fluid-tight against the substrate and the fill layer. The method further includes indenting a first reservoir and a second reservoir through the cap layer, and into the substrate and the fill layer, across the lengths of the array of gaps, so that the array of gaps connects the first reservoir in fluid communication with the second reservoir.