Patent attributes
A controller is configured to obtain a cost function defining a cost of operating building equipment over a time period. The cost function includes a revenue term defining revenue to be obtained by operating the equipment to participate in an incentive program over the time period. The controller is configured to modify the cost function to account for an initial purchase cost of a new asset to be added to the equipment and an effect of the new asset on the cost of operating the equipment. The initial purchase cost of the new asset and the effect of the new asset on the cost of operating the equipment are functions of asset size variables. The controller is also configured to perform an optimization of the modified cost function to determine values for energy load setpoints, the asset size variables, and participation in the incentive program over the time period.