Patent attributes
A method of building and operating a land-based drilling rig with a high-capacity mast include providing a platform collapsed on a substructure over a proposed well drilling location and building the high-capacity mast in a horizontal condition by attaching a lower portion of the high-capacity mast to the platform. The high-capacity mast having an opening formed therein sized to accommodate four Range 2 pipes or three Range 3 pipes. The high-capacity mast may be raised from the horizontal condition to a vertical condition by pushing the side of the high-capacity mast to pivot the high-capacity mast about a pivot point on the platform. The platform may be raised from a collapsed condition to a raised condition over the substructure. Some implementations include dual racking boards on the high-capacity mast.