Each redundancy group is constituted by one active program (storage control software of the active program) and N standby programs (N is an integer of two or more). Each of the N standby programs is associated with a priority to be determined as a failover (FO) destination. In the same redundancy group, FO is performed from the active program to the standby program based on the priority. For the plurality of pieces of storage control software including the active programs and the standby programs that change to be active by FO in the plurality of redundancy groups arranged in the same node, standby storage control software that can set each of the programs as a FO destination are arranged in different nodes.