Patent attributes
A system and method for automating railroad maintenance by a tie gang using electronic tie marking (ETM) configured to optimize railroad asset maintenance. The system enables collision avoidance between members of the tie gang performing maintenance on railway assets (e.g., Rails, Ties, Ballasts, Turnouts, Crossings, etc.). The system can generate production numbers for the railway assets and evaluate an asset queue for the tie gang to perform maintenance. The system can utilize real-time updates from the tie gang to optimize work output. The system can provide a customizable user interface to identify, track, and process information related to maintenance of the railroad asset. The system also provides for a heads-up-display (HUD) to notify an operator of relevant information, such as maintenance information, travel indicators, and updated asset queue. The system can identify a next location and calculate an optimum path based on sensor input incorporating machine-specific and environmental characteristics.