Log in
Enquire now
‌

US Patent 11636429 Model predictive maintenance systems and methods with automatic parts resupply

Patent 11636429 was granted and assigned to Johnson Controls on April, 2023 by the United States Patent and Trademark Office.

OverviewStructured DataIssuesContributors

Contents

Is a
Patent
Patent
0

Patent attributes

Current Assignee
Johnson Controls
Johnson Controls
0
Patent Jurisdiction
United States Patent and Trademark Office
United States Patent and Trademark Office
0
Patent Number
116364290
Date of Patent
April 25, 2023
0
Patent Application Number
164389610
Date Filed
June 12, 2019
0
Patent Citations
‌
US Patent 10250039 Energy storage controller with battery life model
0
‌
US Patent 10359748 Building energy cost optimization system with asset sizing
0
‌
US Patent 10437241 Systems and methods for generating maintenance packages
0
‌
US Patent 10438303 Optimization and distribution of coupons in residential demand response
0
‌
US Patent 10762475 Digital twins for energy efficient asset maintenance
0
‌
US Patent 10591875 Process optimization method and system for a power plant
0
‌
US Patent 11003175 Automated supervisory control system
0
‌
US Patent 10094586 Predictive building control system and method for optimizing energy use and thermal comfort for a building or network of buildings
0
...
Patent Primary Examiner
‌
Juan C Ochoa
0
CPC Code
‌
G05B 23/0294
0
‌
G06Q 30/0206
0
‌
G06Q 10/20
0
‌
G06Q 10/0875
0
‌
G06Q 10/08355
0
‌
G06Q 30/08
0
‌
G05B 23/0283
0

An automatic parts resupply system for building equipment including a model predictive maintenance system configured to determine a service time at which to perform service on the building equipment by performing a predictive optimization of a total cost of operating and servicing the building equipment over a time period. The service time is a decision variable in the predictive optimization. The automatic parts resupply system includes a resupply manager. The resupply manager is configured to generate a parts resupply order for the building equipment based on a result of the predictive optimization. The resupply manager is configured to determine a transmission time at which to transmit the parts resupply order to a parts supplier. The resupply manager is configured to transmit the parts resupply order to the parts supplier at the transmission time.

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like US Patent 11636429 Model predictive maintenance systems and methods with automatic parts resupply

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us