In some examples, a method includes: determining workload constraints for placement of information technology (IT) equipment within a data center; determining physical constraints for placement of the IT equipment; inferring hardware placement capabilities of IT equipment racks within the data center; and generating a ranked list of locations for IT equipment placement within the data center based on the determined workload constraints, determined physical constraints, and inferred hardware placement capabilities.