Patent attributes
A system includes multiple HVAC systems. After receiving a demand request, a multiple-system controller determines a first anticipated power consumption associated with operating a first HVAC system at a first temperature setpoint during a future period of time of the demand response request and a second anticipated power consumption associated with operating a second HVAC system at a second temperature setpoint during the future period of time. Based at least in part on the first and the second anticipated power consumptions, a staging schedule is determined that indicates when to operate the first and second HVAC systems.