Patent attributes
Examples herein include systems and methods for providing capacity forecasting for high-usage periods of a computing infrastructure. An example method can include segmenting a first portion of a data stream and generating a first core set for a forecasting model that predicts future usage of computing resources. The example method can further include segmenting a second portion of the data stream, generating a second core set, and using both core sets to forecast usage. The first core set can then be phased out after a predetermined time period has elapsed such that forecasting is based only on the second core set. The example method can further include defining at least two clusters of data and performing predictive analysis on that specific cluster. Cluster-specific results can be displayed on a GUI, which can also provide a user with options for increase or decrease computing resources based on the predictions.