Patent attributes
A management server including a server performing maintenance and management to a plurality of storage battery apparatuses included in an object of charge and discharge control by a control server. The management server includes processor. The processor is configured to execute a specification process, a selection process, a notification process. The specification process includes a process of specifying each of deterioration degree of the plurality of the storage battery apparatuses. The selection process includes a process of selecting an excluded storage battery apparatus excluding from the object of the charge and discharge control by the control server, out of the plurality of the storage battery apparatuses, based on the deterioration degree specified by the specification process. The notification process includes a process of notifying, to the control server, notification that the charge and discharge control to the excluded storage battery apparatus selected by the selection process is unable.