Patent attributes
An inspection result of a specimen inspection automation system can be reported within a prescribed time, even if a large number of urgent specimens have been input. An instruction reception unit receives turn around time (TAT) information and a discharge instruction. The necessity of discharging a specimen for which the instruction was issued with the discharge instruction is determined and a discharge instruction unit creates a discharge destination and a conveyance route to the discharge destination for the specimen. A discharge mechanism discharges the specimen for which the instruction was issued. Even for a specimen which is caused to wait for processing due to the occurrence of specimen congestion and for which there is a risk of an inspection result reporting delay, an inspection result can be reported within a prescribed time by switching from automatic processing by the system to manual processing by an operator.