A system and method of installing a preconstruction support system for a building, according to which the corresponding ends of two piling sections are connected together and an a auger is provided on one or more of the piling sections. The piling sections are driven into the ground in a manner so that a portion of the uppermost piling section extends above ground; and a concrete slab encases the portion of the piling sections.