A manufacturing management system and method for cross-site lot handling is provided. The system includes a management unit and a target manufacturing site. The target manufacturing site receives a lot, checks whether a lot handling request indicating the lot and the target manufacturing site exists in the management unit, and registers the lot handling request for the lot before the lot being processed if the lot handling request exists.