Patent 7401651 was granted and assigned to Smith International on July, 2008 by the United States Patent and Trademark Office.
A method for performing a service operation within a wellbore extending into a formation comprises sealing a first length of the wellbore to define a first isolated formation zone, flowing a pressurized fluid through a tubular string into the first isolated formation zone, and unsealing the first length of the wellbore without venting the pressurized fluid from the tubular string or awaiting depressurization of the first isolated formation zone.