Patent attributes
An embodiment of a method of estimating overall storage system cost begins with a first step of modeling a storage system design in operation under a workload to determine location of retrieval points. The retrieval points provide sources for primary storage recovery for a plurality of failure scenarios. The method continues with a second step of finding a most recent retrieval point relative to a target recovery time that is available for recovery for a particular failure scenario. A third step determines a difference between the target recovery time and a retrieval point creation time for the most recent retrieval point, which indicates a data loss time period. A fourth step determines a recovery time for propagation of the most recent retrieval point to primary storage. In a fifth step, a storage system cost comprising outlay costs and penalty costs is determined.