A sheet metal factory processing system includes a production manager which generates a processing schedule for multiple units each including at least one material sheet, to manage the processing schedule on a per-unit basis. The processing schedule is generated based on sheet processing data obtained by allocating parts to be blanked from the material sheets according to a manufacturing designation. The sheet metal factory processing system also includes a sheet metal factory processing installation which is connected to the production manager through a communication network. The sheet metal factory processing installation receives the generated processing schedule from the production manager and executes the received processing schedule.