A method for stimulating a multi-zone wellbore completed with a string of production casing, including pumping a first volume of acidic fluid into the wellbore under pressure, and then injecting the first volume of acidic fluid into a first zone of interest along the production casing dropping at least one plug into the wellbore, the plug being fabricated from a material that substantially dissolves in the presence of the acidic fluid at or over a selected period of time.