Patent attributes
In a method for generating a capacity schedule for a facility to meet a predefined operational goal, in which the facility is to receive resources from a first resource supply, a prediction of a supply of resources available from the first resource supply for a predetermined period of time is accessed. In addition, a prediction of a demand for resources in the facility during the predetermined period of time is accessed. The prediction of the supply of resources and the prediction of the demand for resources are inputted into a constrained optimization problem and the capacity schedule for the facility is generated by finding a solution to the constrained optimization problem.