Company attributes
Other attributes
Another important area of Vinnytsiaoblvodokanal, which is the basis of the city's sanitary and environmental well-being, is drainage. The complex of various engineering constructions and measures of sanitary character provide effective collection of sewage from the population and the enterprises of industrial type, transportation of water and its clearing.
Today the number of subscribers who use the services of this utility exceeds 121 thousand. It should also be noted that the number of subscribers in the private sector is 17,255.
On the balance and maintenance of 4 artesian wells.
History of the enterprise:
The first mention of the need to build a water supply system in the county of Vinnytsia appeared in 1902. The population of the city at that time was 30,000 people. The capacity of the water supply system was estimated at 60,000 buckets of water per day. For the city, the amount of 224,447 rubles (namely, this amount was to cost the construction of a water supply system) was unbearable. They returned to the issue of construction in 1910, in December. The city council signed an agreement with merchants Remer, Neer and Ziskind, who acted as contractors for the construction of a water supply system in Vinnytsia.
In 1961, the Ukrprokomunstroy Institute began developing a project to expand the water supply system in Vinnytsia by 50,000 cubic meters. per day with bringing the capacity of waterworks to 80 thousand cubic meters per day. In 1961, the length of water supply networks in Vinnytsia was 112 km. The next stage of water supply expansion in Vinnytsia dates back to 1972, when the relevant project was developed. In 1978, the total length of water supply networks was 236 km. The development of the city was hampered by the low capacity of sewerage networks and the capacity of wastewater treatment plants. It was decided to build additional capacity of the city USC, sewage pumping stations and networks in the city. In 1965 the first stage of the queue of biological treatment plants with a capacity of 9,000 m per day was put into operation, in 1966 the second stage of the second stage with a capacity of 9 more was put into operation. 000 m per day, and in 1967 introduced three stage queues with a capacity of 9,000 m-day. Thus, the total capacity of sewage treatment plants of the first and second stages reached 33 thousand m-day.
But this did not solve all the problems, especially since in the period from 1979 to 1990 due to the construction of water supply station №3, additional water mains and reservoirs, the total capacity of the water supply system was increased to 230 thousand cubic meters. m. per day. Therefore, in 1967 the construction of the third stage of sewage treatment plants was started, which by the 1980s had increased the capacity of the USC to 83 thousand cubic meters. m. per day. And with the gradual introduction of the IV stage, during 1984 - 1987 and the V stage, in 1991-1993, and the removal due to moral and physical deterioration of buildings of the I and II stages, the total capacity of USC reached 150 thousand cubic meters. m. per day.
In 1976 on the basis of the main enterprise of water supply and sewerage economy of Vinnytsia the regional production enterprise "Vinnytsiavodokanal" was created. It included 9 district water supply and sewerage facilities.